A dated downstairs loo that needed refurbishment. I removed the old suite, tiles and flooring then replastered the ceiling and walls. Then I laid a new Amtico Click floor after I had repaired the sub-floor. I used my carpentry skills to fit some some boxing in and new architrave and skirting. Then I had to fit the basin and toilet before tiling the splashback around the sink.
Another bathroom project from my time with AGS Gas Ltd, this time in Sambourne. Andrew, the carpenter on site, had done an incredible job reviving the Elm flooring which was hundreds of years old. The modern bathroom sat nicely in the room with a freestanding bath, a recessed shower diverter valve and a niche to keep those bottles of shampoo on bringing modern luxuries to a beautiful old building.
Comments
Post a Comment